Quick Links
Skip to main content Skip to navigation
 
default rotator image
default masthead image tranparent rotator image

Home > breadcrumbs: District > breadcrumbs: 2015 Bond Issue Information >

Working...

Ajax Loading Image

 

Track Parking During Phase II Construction


Skip image

Story image 1_0
58a7076d5c67f

Phase II Construction is currently underway at Marysville Junior/Senior High.  Patrons of the school district who use the track for exercise will be able to continue doing this, but you will likely have to park in a different location to access the track.  We are asking all patrons who want to use the track to park on the east side of the Metals Building or the south side of the Agriculture Technology Building and access the track through the gates in those areas.  We would also ask all patrons to stay out of the construction areas and to be alert as you walk near these areas.

Sub Navigation

Top

  • Facebook Icon
  • Facebook Icon
  • Twitter Icon
footer imagetranparent footer image

Marysville Schools, USD 364211 South 10thMarysville, KS  66508

p. 785.562.5308f. 785.562.5309

Sign up for the News Update.

Back To Top