Search Site

This search form uses an instant search feature. As you type, search results will appear automatically below the search field. When you've entered you desired search terms use tab to navigate through the available results and hit enter to open the selected page or document.
Road Construction US77
Road Construction US77
Denise Guy
Tuesday, August 20, 2019

8-19-19

Dear Parents and Students:

Beginning August 22nd, KDOT will be replacing US77, west of the MJSHS from Broadway to Spring street.  Please see map. 

Beginning August 22nd

- KDOT will begin traffic control along US77 at Broadway, Elm, and Walnut streets.

- Right hand turns only from US77 on to Walnut Street and the MJSHS Parking Lot entrance.  Eventually, eastbound intersections from US77 onto Broadway, Elm, and Walnut will be closed.

- Buses will load on Walnut, east of the Bulldog or in front of High School.  Eleventh street will become a one-way street traveling south from Broadway for buses to deliver and pick up students.

- Parents will drop off and pick up students on 12th and Spring Street, east of the high school.  This will be a one-way street traveling south from Broadway. 

Beginning September 3rd

On September 3rd, foot traffic across US77 will be discouraged.  We will provide a shuttle pick up at the swimming pool parking lot to transport students across to the Ag building.   Shuttle will be available between 7:30am and 8:30am picking up every 10 minutes. Students will be transported back to the parking lot from 3:40pm to 4:15pm.

Please see map.  The projected completion date for this phase is November 15th.

For questions, please call Dr. Denise Guy, 785-562-5308 or Mr. Darren Schroeder, 785-562-5386

Plans will be reviewed for changes as needed.

Please help us keep our students safe.